The project is government investment. In this respect, the board’s priority is a simple, inexpensive structure with fast construction duration. Therefore the design offers a layout with repetition of a single unit. Two of this single unit is placed on a triangular base with an angle and this triangle unit is repeated three times with rotation. The result is a dynamic massing and diversified perceptions with the repetition of a single unit.
Ankara
2010
210 000 m2